Description
Location : Shandong, PR China
Capacity : 49.5 MW
Commissioned : 2018
Guohua Rongcheng Phase III Wind Farm Project (GRP3) is located Chengshan Town, Rongcheng City, Shandong Province, People’s Republic of China. GRP3 consists of 33 wind turbines with a total generation capacity of 49.5MW. The power generated will be delivered to the North China Power Grid providing electricity for 76,500 Chinese families. The estimated annual average emission reduction is 97,200 tCO2e. The project employed 65 staff during construction and 24 permanent local staff in operation, improving the living standard of local people.